DESIGN AND CONSTRUCTION OF A ENERGY CONSUMPTION INDICATOR

DESIGN AND CONSTRUCTION OF A ENERGY CONSUMPTION INDICATOR
ABSTRACT

Electricity demands in hospitals and other public places are characterized by their need for high quality, guaranteed supplies. The existence of captive electricity uses and the size and regularity of the electrical and heat loads required by hospitals are aspects that could well buttress the possibility of installing cogeneration plants fired by natural gas (CHP).
The purpose of this project is to estimate the CHP technical potential in hospitals. Based on a classification of hospitals by specific energy consumption indicators, this potential are assessed, taking into consideration gas fueled engines associated with absorption cooling systems. A potential figure of approximately 500 MWe was obtained, whose effective implementation runs up against the obstacles inherent to hospital sector.

TABLE OF CONTENTS
Cover Page – – – – – – – – – –
Title Page – – – – – – – – – –
Certification – – – – – – – – – –
Dedication – – – – – – – – – –
Acknowledgement – – – – – – – – –
Abstract – – – – – – – – – –
Table of Content – – – – – – – – –
Chapter One: Introduction
Background of the Study – – – – – –
Statement of the Problem – – – – – –
Objectives of the Study – – – – – – –
Research Questions – – – – – – –
Research Hypotheses – – – – – – –
Significance of the Study – – – – – – –
Scope/ Limitation of the Study – – – – – –
Definition of Terms – – – – – – –
Chapter Two: Review of Related Literature
2.1 Introduction – – – – – – – – –
2.2 Conceptual Framework – – – – – – –
2.3 Theoretical Framework – – – – – – –
2.4 Empirical Review – – – – – – – –

 

TO GET THE FULL AND COMPLETE WORK

 

INSTRUCTIONS AFTER PAYMENT

After making payment to any of these accounts:

ANDY KINGSLEY UKPONG: GT bank 0153529318

ANDY KINGSLEY UKPONG: UBA 2034365030

Kindly send the following:

  • Your Full name:
  • Your Active Email Address:
  • Your Phone Number:
  • Amount Paid:
  • Project Topic:
  • Bank Name and Location you made payment from:
  • SEND DETAILS  As Text Message To, 07069364143, 
  • The full and complete work (material) will be sent to your:
  • Email or WhatsApp

 

Terms of Use:   This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as guide in developing your original research work. If you have read and accepted our Terms of Use, order online/pay into our bank accounts above, or Contact Us directly. Thanks.

Sharing is caring!

Download Full and Complete Project

About projectmaterial

Check Also

DESIGN AND CONSTRUCTION OF A HUMAN DETECTION ROBOT

DESIGN AND CONSTRUCTION OF A HUMAN DETECTION ROBOT Format: Ms Word Document Pages: 73 Price: …

DESIGN AND CONSTRUCTION OF A PASSWORD BASED CIRCUIT BREAKER

DESIGN AND CONSTRUCTION OF A PASSWORD BASED CIRCUIT BREAKER Format: Ms Word Document Pages: 73 …

DESIGN AND CONSTRUCTION OF EXPLOSIVE DETECTION SYSTEM

DESIGN AND CONSTRUCTION OF EXPLOSIVE DETECTION SYSTEM Format: Ms Word Document Pages: 73 Price: N …

DESIGN AND CONSTRUCTION OF DEAD MAN’S SWITCH

DESIGN AND CONSTRUCTION OF DEAD MAN’S SWITCH Format: Ms Word Document Pages: 73 Price: N …

DESIGN AND CONSTRUCTION OF BATTERY LEVEL INDICATOR

DESIGN AND CONSTRUCTION OF BATTERY LEVEL INDICATOR Format: Ms Word Document Pages: 73 Price: N …

DESIGN AND CONSTRUCTION OF A 3-PHASE IRRIGATION WATER PUMP CONTROLLER F USING DUAL GSM MODEMS

DESIGN AND CONSTRUCTION OF A 3-PHASE IRRIGATION WATER PUMP CONTROLLER F USING DUAL GSM MODEMS …

Leave a Reply

Your email address will not be published. Required fields are marked *