An investigation in the suitability of accident sensor in the control of industrial accident. (a case study of spdc port-harcourt).

AN INVESTIGATION IN THE SUITABILITY OF ACCIDENT SENSOR IN THE CONTROL OF INDUSTRIAL ACCIDENT. (A CASE STUDY OF SPDC PORT-HARCOURT).

Accident Sensor

INTRODUCTION

The main aim of the project Accident Detection and Messaging System is to inform the Ambulance and Police of the accident site and arrange for necessary steps to control the situation. This system is not only efficient but also worthy to be implemented. . The Accident Detection and Messaging System can be fitted in the vehicle (Ambulance or the Police) and they are informed about any such untoward incident at the go.

Accident Detection and Messaging System execution is simple as the system makes use of GSMand GPS technologies. GPS is used for taking the coordinates of the site of the accident while GSM is used for sending the coordinates to cell phones. To make this process all the controls are made using Arduino whereas a LCD is used to display the coordinates.

TABLE OF CONTENTS
Cover Page – – – – – – – – – –
Title Page – – – – – – – – – –
Certification – – – – – – – – – –
Dedication – – – – – – – – – –
Acknowledgement – – – – – – – – –
Abstract – – – – – – – – – –
Table of Content – – – – – – – – –
Chapter One: Introduction
Background of the Study – – – – – –
Statement of the Problem – – – – – –
Objectives of the Study – – – – – – –
Research Questions – – – – – – –
Research Hypotheses – – – – – – –
Significance of the Study – – – – – – –
Scope/ Limitation of the Study – – – – – –
Definition of Terms – – – – – – –
Chapter Two: Review of Related Literature
2.1 Introduction – – – – – – – – –
2.2 Conceptual Framework – – – – – – –
2.3 Theoretical Framework – – – – – – –
2.4 Empirical Review – – – – – – – –

Chapter Three: Research Methodology
3.1 Introduction – – – – – – – –
3.1 Research Design – – – – – – – –
3.3 Area of the Study – – – – – – – –
3.4 Population of the Study – – – – – – –
3.5 Sample Size and Sampling Techniques – – – –
3.6 Instrumentation – – – – – – – –
3.7 Validation of the Instrument – – – – – –
3.8 Administration of the Instrument – – – – –
3.9 Method of Data Analysis – – – – – – –

Chapter Four: Presentation, Analysis and Interpretation of Data
4.1 Introduction – – – – – – – – –
4.2 Presentation and Analysis of Data – – – – –
4.3 Testing of Hypotheses – – – – – – –
4.4 Discussion of Findings – – – – – – –
Chapter Five: Summary, Conclusion and Recommendations
5.1 Introduction – – – – – – – – –
5.2 Summary – – – – – – – – –
5.3 Conclusion – – – – – – – – –

About admin

Check Also

Forecasting the viability of siting a waste pure water polyethylene recycling machine in Owerri

Forecasting the viability of siting a waste pure water polyethylene recycling machine in Owerri TABLE …

ASSESSMENT OF POTENTIALS OF WASTE TO WEALTH

ASSESSMENT OF POTENTIALS OF WASTE TO WEALTH IN NIGERIA ABSTRACT Municipal solid wastes re-use and …

ENVIRONMENTAL PROTECTION AGENCY STRATEGY FOR REDUCING HEALTH RISKS IN URBAN AREAS

ENVIRONMENTAL PROTECTION AGENCY STRATEGY FOR REDUCING HEALTH RISKS IN URBAN AREAS CHAPTER ONE INTRODUCTION 1.1     …

Environment Impact Of A Dump Site On The Geo Environment Using Soil And Water

ENVIRONMENT IMPACT OF A DUMP SITE ON THE GEO ENVIRONMENT USING SOIL AND WATER CHAPTER …

Impact Of Sanitary Landfills Towards Sustainable Development In Nigeria

IMPACT OF SANITARY LANDFILLS TOWARDS SUSTAINABLE DEVELOPMENT IN NIGERIA   CHAPTER ONE INTRODUCTION 1.1       Background …

Impact Of Marine Pollution On Shipping Operation In The South-South Geopolitical Zone

IMPACT OF MARINE POLLUTION ON SHIPPING OPERATION IN THE SOUTH-SOUTH GEOPOLITICAL ZONE CHAPTER ONE INTRODUCTION …

Leave a Reply

Your email address will not be published. Required fields are marked *