environmental factors influencing construction time and cost overruns on high-rise project in nigeria

ENVIRONMENTAL FACTORS INFLUENCING CONSTRUCTION TIME AND COST OVERRUNS ON HIGH-RISE PROJECT IN NIGERIA

TABLE OF CONTENTS
Cover Page – – – – – – – – – –
Title Page – – – – – – – – – –
Certification – – – – – – – – – –
Dedication – – – – – – – – – –
Acknowledgement – – – – – – – – –
Abstract – – – – – – – – – –
Table of Content – – – – – – – – –
Chapter One: Introduction
Background of the Study – – – – – –
Statement of the Problem – – – – – –
Objectives of the Study – – – – – – –
Research Questions – – – – – – –
Research Hypotheses – – – – – – –
Significance of the Study – – – – – – –
Scope/ Limitation of the Study – – – – – –
Definition of Terms – – – – – – –
Chapter Two: Review of Related Literature
2.1 Introduction – – – – – – – – –
2.2 Conceptual Framework – – – – – – –
2.3 Theoretical Framework – – – – – – –
2.4 Empirical Review – – – – – – – –

Chapter Three: Research Methodology
3.1 Introduction – – – – – – – –
3.1 Research Design – – – – – – – –
3.3 Area of the Study – – – – – – – –
3.4 Population of the Study – – – – – – –
3.5 Sample Size and Sampling Techniques – – – –
3.6 Instrumentation – – – – – – – –
3.7 Validation of the Instrument – – – – – –
3.8 Administration of the Instrument – – – – –
3.9 Method of Data Analysis – – – – – – –

Chapter Four: Presentation, Analysis and Interpretation of Data
4.1 Introduction – – – – – – – – –
4.2 Presentation and Analysis of Data – – – – –
4.3 Testing of Hypotheses – – – – – – –
4.4 Discussion of Findings – – – – – – –
Chapter Five: Summary, Conclusion and Recommendations
5.1 Introduction – – – – – – – – –
5.2 Summary – – – – – – – – –
5.3 Conclusion – – – – – – – – –

Introduction

Construction time: The Nigerian construction industry contributes less to the country’s economy than do manufacturing or other service industries. Of®cially, construction accounted for only 5.5% of the annual gross domestic product (GDP) in 1993 (Langdon, 1994). However, the growth of the Indonesian construction industry has greatly in¯ uenced the country’s economic development. As de®ned in developed countries (Hillebrandt, 1985), con- struction is considered unique in that it can stimulate the growth of other industrial sectors. Hence to consider growth of the construction industry in terms of its contribution to GDP in isolation is somewhat misleading: that is, to do so understates the crucial role played by construction. Therefore, improving construction ef®- ciency by means of cost-effectiveness and timeliness would certainly contribute to cost savings for the country as a whole. Effort directed to cost and time- effectiveness were associated with managing time and cost, which in this study was approached via investigating time and cost overruns of high-rise construction in Nigeria.

Like developing countries, such as Nigeria (Okpala and Aniekwu, 1988; Elinwa and Buba, 1993;
Mans®eld et al., 1994), Saudi Arabia (Assaf et al., 1995) and Malaysia (Yong, 1988), Indonesia suffers from construction time and cost overruns. The intentions
of this paper therefore are:

1. to identify variables in¯ uencing construction time and cost overruns;
2. to group these variables into factors;
3. to analyse the relationship of these factors and thereby enhance understanding of construction delays and cost overruns. Although the research concentrates on Nigeria, the ®ndings should be relevant to all developing countries, as they face similar problems in terms of time and cost overruns on construction and infrastructural development projects (Morris and Hough, 1987). Construction Management and Economics (1997) 15, 83±94 Factors in¯ uencing construction time and cost overruns on high-rise projects in Nigeria

Causes of time and cost overruns

According to Antill and Woodhead (1989), time overruns
(delays) can be divided into three categories:
1. those over which neither party to the contract has any control;
2. those over which the construction owner (or his/her representative) has control;
3. those over which the contractor (or any subcontractor) has control.
It is generally recognized that delays of type 1 are part of the contractor’s normal and legitimate monetary
risk, and hence should give neither party grounds for monetary recompense, but that the contract com- pletion date should be extended in order to protect contractors from liquidated damages claims for late  completion. Alternatively, in the extreme a contract may be repudiated due to `frustration’. It is also recog- nized that for delays of type 2 the contractor should receive fair and reasonable recompense (cost and time), whereas for type 3 delays the contractor must bear full responsibility.

Cost data

Accurate estimates concerning materials, equipment
and labour outputs depend on reliable cost data. The Ministry of Public Works, through its Centre for Building Information, publishes (as a guide for public works) quarterly cost data, which include the unit price of materials and labour wages. However, the data are useful only as a bidding guide, and are not consistent  enough for effective construction planning. Reliable cost data such as the Wessex (1995), as found in the UK, do not exist in Indonesia. Contractors have to maintain their own historical cost data

environmental factors influencing construction time and cost overruns on high-rise project in nigeria

About admin

Check Also

Forecasting the viability of siting a waste pure water polyethylene recycling machine in Owerri

Forecasting the viability of siting a waste pure water polyethylene recycling machine in Owerri TABLE …

ASSESSMENT OF POTENTIALS OF WASTE TO WEALTH

ASSESSMENT OF POTENTIALS OF WASTE TO WEALTH IN NIGERIA ABSTRACT Municipal solid wastes re-use and …

ENVIRONMENTAL PROTECTION AGENCY STRATEGY FOR REDUCING HEALTH RISKS IN URBAN AREAS

ENVIRONMENTAL PROTECTION AGENCY STRATEGY FOR REDUCING HEALTH RISKS IN URBAN AREAS CHAPTER ONE INTRODUCTION 1.1     …

Environment Impact Of A Dump Site On The Geo Environment Using Soil And Water

ENVIRONMENT IMPACT OF A DUMP SITE ON THE GEO ENVIRONMENT USING SOIL AND WATER CHAPTER …

Impact Of Sanitary Landfills Towards Sustainable Development In Nigeria

IMPACT OF SANITARY LANDFILLS TOWARDS SUSTAINABLE DEVELOPMENT IN NIGERIA   CHAPTER ONE INTRODUCTION 1.1       Background …

Impact Of Marine Pollution On Shipping Operation In The South-South Geopolitical Zone

IMPACT OF MARINE POLLUTION ON SHIPPING OPERATION IN THE SOUTH-SOUTH GEOPOLITICAL ZONE CHAPTER ONE INTRODUCTION …

Leave a Reply

Your email address will not be published. Required fields are marked *